Application Instructions
AquaBoostAG is a liquid which can be applied via any irrigation system in the same way as liquid fertilsers are applied.
Instruction summary:
- Run/prime the irrigation system for about 15 minutes before adding the AquaBoost.
- Add AquaBoost at 7 litres per hectare to the irrigation system.
- Once the AquaBoost has been added, complete the irrigation cycle to wash the AquaBoost into the soil.
Detailed instructions:
- Two applications of 3.5l AquaBoost per ha about 4-5 days apart.
- Each application should be applied with at least 7mm of irrigation water (70,000l of water per ha) for centre pivots and 3 - 4mm of waters for dripper and micro-sprayers. The irrigation can be decreased after this. This rate of water ensures the AquaBoostAG is washed into the soil allowing it to work.
- When applying the AquaBoost, you must run the irrigation system for about 15 minutes before adding the AquaBoost, to prime the system and moisten the soil.
- If you are using a mixing tank please do not mix the AquaBoost with water and fertilizer. The AquaBoost needs to be mixed in the tank with water only. There is no need to clean the mixing tank before adding the AquaBoost so long as it has run at least once with just water.
- If increased yield is your goal, then you should apply the fertilizer immediately after the second AquaBoost application. This will maximize the fertilizer efficacy.
The AquaBoostAG will last in the soil for approximately 8 - 10 weeks. After 8 - 10 weeks this process can be repeated.